INT-144 : FAME Manufacturing Core Exercise 3, LEAN Manufacturing

This course introduces the Federation of Advanced Manufacturing Education (FAME) MCE-3 (Manufacturing Core Exercise) for Lean Manufacturing.  Students will be introduced to a systematic method for waste minimization (AKA:  Muda) within a manufacturing system, without sacrificing productivity.  Lean also takes into account waste created through overburden (AKA:  Muri) and waste created through unevenness in workloads (AKA:  Mura).  The Lean management philosophy will be clearly defined and explained with experiential exercises, reinforcing the following concepts: The value-added product; The maintenance value-added product; Value-added work and necessary work; How this leads to increased profit; Workload unevenness (Mura); Waste created through overburden (Muri). The seven areas of non-value-added waste (Muda):  conveyance, correction, motion, over-production, over-processing, waiting and inventory

Prerequisites

As determined by college